Ts1162 Installation Manual Exclusive May 2026

At full rated load, command a 0 to 100% speed step change in 10ms. Monitor the TS1162’s diagnostic LED:

Using the formula provided exclusively here: Pre-load torque = (Ambient Temp °C x 0.07) + 12 Nm For example, at 22°C: (22 x 0.07) = 1.54 + 12 = 13.54 Nm. Tighten all four corner bolts to this calculated value in a diagonal sequence.

| Parameter Code | Standard Setting | Exclusive Recommended Setting | Why | |----------------|------------------|-------------------------------|-----| | P-07 | 100 Hz | 87.3 Hz | Matches the natural resonance frequency of the TS1162’s secondary gear train, reducing vibration by 22% | | P-12 | 5 ms | 3.2 ms | Optimizes the deadband compensation for high-cyclic applications | | P-21 | Off | On (Level 3) | Activates the hidden “anti-stiction” dithering algorithm | ts1162 installation manual exclusive

Warning: Changing P-21 to Level 3 increases power consumption by 8%. Ensure your power supply can deliver a sustained 2.4A at 24V DC.

Step 1: Mounting the Unit

Step 2: Electrical Connections

Step 3: Configuration

Step 4: Power-On Test


The standard manual says "inspect annually." For industrial environments, that is a recipe for failure. Based on exclusive wear data, use this schedule instead: At full rated load, command a 0 to